This project was the ground-up construction of a 13,840 square foot gymnasium. This gymnasium was constructed with steel frame construction and wood infill on a floating foundation. The project also included new locker rooms, restrooms, and lobby. Rodan self-performed the site work and underground utilities which allowed us to drive the schedule and keep the project on track.

DOWNLOAD DATA SHEETS